Gov’t Starts Construction of a Bridge Linking Bukedea and Butebo Districts

Date:

Share post:

The Ministry of Works and Transport, in partnership with Mount Elgon Labor-Based Training Center (MELTC), has embarked on the construction of the Onyamalugai and Komuge-Kadesok-Kakoro bridge, which connects Bukedea and Butebo districts.

The Principle Executive Engineer (MELTC) Ssentamu Hassan noted that the bridge is being constructed in a box culvert design with a three-cell structure of 4 m x 3 m and six triple barrel relief culverts (1.2 m internal diameter each) along the same swamp to provide resistance overflow of swamp water.

Eng. Ssentamu revealed that once completed, the bridge will ease the movement of goods and services between the two districts of Bukedea and Butebo to foster economic growth in the area.

The two districts had previously been cut off after the drainage structures were washed away during the heavy rains of 2021.

Related articles

How Clarissa Escaped Rape at the Nyege Nyege Festival

Clarissa is a young woman in her early 30s who wanted to experience the famous Nyege Nyege Festival,...

President Museveni Pardons 19 NUP Supporters After Pleading Guilty

President Yoweri Kaguta Museveni on November 22, 2024, pardoned 19 supporters of the National Unity Platform (NUP) who...

UNRA to Commence works at Mabira section along the Kampala—Jinja highway

The Uganda National Road Authority (UNRA) has announced upcoming maintenance works at the Mabira section along the Kampala...

Manifesto Week 2024: Uganda’s Tourism Industry Makes Significant Progress

During the Manifesto Week 2024, the Ministry of Tourism, Wildlife, and Antiquities showcased major achievements in Uganda’s tourism...